Identify your real constraint stage and simulate the effect of reducing it.
The Optimized Lab Business Toolkit
Every lab has one slowest step, and it sets the pace for everything else. Speeding up any other stage changes almost nothing until that one is fixed. This diagnostic finds your bottleneck and shows what fixing it would do to your total turnaround.
Enter the hours a typical case spends in each of six stages: intake and planning, CAD design, milling, sintering, quality control, and shipping.
A slider then simulates cutting the bottleneck by 10% to 90% so you can see the new cycle time. This is the Theory of Constraints, from Eliyahu Goldratt’s 1984 book The Goal: a system’s output is governed by its single slowest step.
With the starting values (24 hours of intake and planning, 8 of design, 4 of milling, 8 of sintering, 2 of QC and 24 of shipping), a case takes 70 hours. Planning and shipping dominate; milling, the stage owners usually want to upgrade first, is only 4. Halving planning time with clearer prescriptions and a fixed intake routine saves 12 hours, more than a faster mill could.
Fix one bottleneck and the constraint moves to the next-slowest stage. As the book puts it: you never eliminate the bottleneck; you only earn the right to meet the next one.
Time a handful of real cases through each stage, or ask where cases sit waiting. The stage with the longest time, or the biggest pile in front of it, is usually the constraint.
If the new equipment was not on the bottleneck, the cases simply wait somewhere else. Improve the constraint first.
It varies. Once digital workflows remove most transit and planning time, the constraint moves. In the book, the constraint turned out to be a single sintering furnace on fixed eight-hour cycles, not the mill. Reorganizing the design queue so cases filled each furnace load, and moving one load earlier in the day, cut turnaround by more than a full day with no new equipment.